From inquiry to switched-on in just 7–14 days.
No multi-month waits. Survey, engineered quotation, installation, and net-metering paperwork — all compressed into one to two weeks, without cutting corners.
Four steps, one accountable team.
The same engineer who surveys your roof owns the project through to commissioning — so nothing gets lost between sales and installation.
- 01
Free site survey
A same- or next-day visit. We measure your usable roof area, check shading and orientation, inspect your distribution board, and review the last 12 months of your electricity bills on the spot — no charge, no obligation.
TimelineDay 1 - 02
Engineered quotation
We size the system to your actual load, not a generic kW guess. You receive a clear PDF with the design, exact equipment list, a 25-year savings projection, and locked, itemised pricing — usually within 48 hours of the survey.
TimelineDay 2–3 - 03
Installation & delivery
Our certified in-house crew arrives — no sub-contracting. Equipment comes from authorised dealers only. Most residential systems are installed, wired, earthed, and energised in 2–5 working days, with a commissioning test before handover.
TimelineDay 4–10 - 04
Commissioning & net metering
Your system goes live and we file your net-metering or net-billing application with your DISCO in parallel — preparing the drawings, paying the concurrence fee, and coordinating the bi-directional smart meter so it activates within the same two-week window.
TimelineDay 10–14
Commercial & industrial timelines.
The 7–14 day window covers most residential installs. Larger systems follow the same four stages but need more time for engineering, procurement, and DISCO concurrence:
- Commercial (25–200kW) — typically energised in 6–10 weeks, including structural assessment and a PEC-stamped single-line diagram.
- Industrial EPC (200kW–5MW) — 30–120 days from signed contract, with engineering and procurement running in parallel with civil works.
- Net-metering approval — runs alongside in every case; your system saves money from day one through self-consumption while the DISCO process completes.
Talk to a real engineer.
Start with a free survey — switched on within two weeks.